Boost Your Productivity !Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Application for a building permit
Application for a permit
Application for building permit
Apprise licence applications
Apprise permit applications
Assess licence applications
Building Permit Coding System
Building certificate
Building consent
Building permit
Building permit
Building permit document
Construction licence
Construction permit
Draw up building permit applications
Judge permit applications
Permit application
Planning permission
Planning permission
Prepare building permit application
Prepare building permit applications
Preparing building permit applications

Translation of "Application for building permit " (English → French) :

TERMINOLOGY
see also In-Context Translations below
application for building permit

demande de permis de construire [ demande en autorisation de bâtir ]
Urban Housing | Regulations (Urban Studies)
Habitation et logement (Urbanisme) | Réglementation (Urbanisme)


prepare building permit application | preparing building permit applications | draw up building permit applications | prepare building permit applications

préparer des demandes de permis de construire
skill
Aptitude


planning permission | building permit | construction permit

permis de bâtir | autorisation de construire | permis de construire
Building & civil engineering | Law, legislation & jurisprudence
Généralités (Constructions et génie civil) | Droits réels (Droit)


application for a building permit

demande de permis de construire
industrie de la construction
industrie de la construction


building permit [ building permit document ]

permis de construire [ permis de construction ]
Municipal Administration | Municipal Administration | Construction Standards and Regulations | Construction Standards and Regulations | Regulations (Urban Studies) | Regulations (Urban Studies)
Administration municipale | Administration municipale | Réglementation et normalisation (Construction) | Réglementation et normalisation (Construction) | Réglementation (Urbanisme) | Réglementation (Urbanisme)


application for a permit | permit application

demande d'autorisation
Public & private administration | Law, legislation & jurisprudence | Politics
Force publique (Administration publique et privée) | Droit public (Droit) | Migrations - colonisation (Politique)


building permit | building consent | building certificate

permis de construire | permis de bâtir | autorisation de construire | autorisation de bâtir | permis de construction
administration publique > administration municipale
administration publique > administration municipale


planning permission (1) | building permit (2) | construction licence (3)

autorisation d'aménager
Environment & ecology
évacuation des déchets (solides et liquides) (Environnement)


Building Permit Coding System

Système de codage de permis de bâtir
System Names
Noms de systèmes


apprise licence applications | judge permit applications | apprise permit applications | assess licence applications

évaluer des demandes de licence
skill
Aptitude
IN-CONTEXT TRANSLATIONS
1. Member States shall ensure that all newly constructed buildings at the end-user's location, including elements thereof under joint ownership, for which applications for building permits have been submitted after 31 December 2016, are equipped with a high-speed-ready in-building physical infrastructure, up to the network termination points.

1. Les États membres veillent à ce que tous les immeubles neufs au niveau des locaux de l'utilisateur final, y compris les éléments de ceux-ci en copropriété, pour lesquels des demandes de permis de construire ont été introduites après le 31 décembre 2016, soient équipés d'une infrastructure physique adaptée au haut débit située à l'intérieur de l'immeuble, jusqu'aux points de terminaison du réseau.


2. Member States shall ensure that all newly constructed multi-dwelling buildings, for which applications for building permits have been submitted after 31 December 2016, are equipped with an access point.

2. Les États membres veillent à ce que tous les immeubles collectifs neufs pour lesquels des demandes de permis de construire ont été introduites après le 31 décembre 2016 soient équipés d'un point d'accès.


The same obligation applies in the event of major renovation works concerning multi-dwelling buildings for which applications for building permits have been submitted after 31 December 2016.

Cette obligation s'applique également aux travaux de rénovation de grande ampleur concernant des immeubles collectifs pour lesquels des demandes de permis de construire ont été introduites après le 31 décembre 2016.


The same obligation applies in the event of major renovation works for which applications for building permits have been submitted after 31 December 2016.

Cette obligation s'applique également aux travaux de rénovation de grande ampleur pour lesquels des demandes de permis de construire ont été introduites après le 31 décembre 2016.


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
1. Member States shall ensure that all newly constructed buildings at the end-user's location, including elements thereof under joint ownership, for which applications for building permits have been submitted after 31 December 2016, are equipped with a high-speed-ready in-building physical infrastructure, up to the network termination points.

1. Les États membres veillent à ce que tous les immeubles neufs au niveau des locaux de l'utilisateur final, y compris les éléments de ceux-ci en copropriété, pour lesquels des demandes de permis de construire ont été introduites après le 31 décembre 2016 , soient équipés d'une infrastructure physique adaptée au haut débit située à l'intérieur de l’immeuble, jusqu'aux points de terminaison du réseau.


2. All newly constructed public multi-dwelling buildings, including social housing, for which applications for building permits have been submitted after [Publications Office: please insert the exact date of the entry into force of this Regulation], should be equipped with a neutral technology, after having been assessed as regards the cost effectiveness of equipping them with concentration point, located inside or outside the building, and accessible to electronic communi ...[+++]

2. Tous les immeubles collectifs publics nouvellement construits, y compris les logements sociaux, pour lesquels des demandes de permis de construire ont été introduites après le [Office des publications: veuillez insérer la date exacte d'entrée en vigueur du présent règlement], devraient être équipés d'une infrastructure neutre sur le plan technologique, après avoir été évalués pour déterminer l'intérêt, en termes de rapport coût-efficacité, de les équiper d'un point de c ...[+++]


2. All newly constructed multi-dwelling buildings, for which applications for building permits have been submitted after [Publications Office: please insert the exact date of the entry into force of this Regulation], shall be equipped with a concentration point, located inside or outside the building, and accessible to electronic communications networks providers, whereby connection to the high-speed-ready in-building infrastructur ...[+++]

2. Tous les immeubles collectifs neufs pour lesquels des demandes de permis de construire ont été introduites après le [Office des publications: veuillez insérer la date exacte d'entrée en vigueur du présent règlement] sont équipés d'un point de concentration, situé à l'intérieur ou à l'extérieur du bâtiment et accessible aux fournisseurs de réseaux de communications électroniques, qui permet le raccordement à l'infrastructure adaptée au haut débit située à l'intérieur du ...[+++]


1. All newly constructed public buildings at the end-user's location, including elements under joint ownership, for which applications for building permits have been submitted six months after [Publications Office: please insert the exact date of the entry into force of this Regulation], should be equipped with neutral technology, after having been assessed as regards the cost effectiveness of equipping them with high-speed-ready i ...[+++]

1. Au niveau des locaux de l'utilisateur final, toutes les constructions neuves publiques, y compris les éléments en copropriété, pour lesquelles des demandes de permis de construire ont été introduites six mois après le [Office des publications: veuillez insérer la date exacte d'entrée en vigueur du présent règlement], devraient être équipées d'infrastructures neutres sur le plan technologique, après avoir été évaluées pour déterminer l'intérêt, en termes de rapport coût- ...[+++]


1. All newly constructed buildings at the end-user's location, including elements under joint ownership, for which applications for building permits have been submitted after [Publications Office: please insert the exact date of the entry into force of this Regulation], shall be equipped with a high-speed-ready in-building physical infrastructure, up to the network termination points.

1. Au niveau des locaux de l'utilisateur final, toutes les constructions neuves, y compris les éléments en copropriété, pour lesquelles des demandes de permis de construire ont été introduites après le [Office des publications: veuillez insérer la date exacte d'entrée en vigueur du présent règlement] sont équipées d'une infrastructure physique adaptée au haut débit, jusqu'aux points de terminaison du réseau.


‘major renovation works’ means building or civil engineering works at the end user's location encompassing structural modifications of the entire in-building physical infrastructure or a significant part thereof, and requiring a building permit.

«travaux de rénovation de grande ampleur», des travaux de construction ou de génie civil dans l'immeuble où se situent les locaux de l'utilisateur final, qui impliquent des modifications structurelles de l'intégralité de l'infrastructure physique située à l'intérieur d'un immeuble ou d'une partie importante de celle-ci, et nécessitent un permis de construire.




www.wordscope.com (v4.0.br.77)

'Application for building permit'

Date index:2021-01-06 -

Pour agences de traduction et traducteurs - For translation agencies & translators

Paris - Brussels - Montreal - Genève - Luxembourg - Madrid

Wordscope - Professional computer-assisted translation tools (CAT tools)