WordscopeLooking for the accurate translation of a word in context?
Wordscope has indexed thousands of quality sites to help you!
Opinions from our customers and partners«Wordscope is an essential tool for our service! It consists of a huge, multilingual database in which we can find the information necessary for all good translations in context.»

Stijn De Smeytere
Coordinator of the Translation and Interpretation Service

Chancellery of the Prime Minister
Share this page!
   
Wordscope Video
“Innovating to zero! - TED Talks -”

(video with English subtitles)

Translation of "take-off climb procedure " (English → French) :

TERMINOLOGY
see also In-Context Translations below
take-off climb procedure

procédure de montée après décollage


take-off climb

montée après décollage | montée au décollage


take-off climb limits

limitations de montée au décollage


limiting take-off climb requirement

critère minimal de montée au décollage | exigence limitative de montée après décollage




take-off climb performance

performances en montée au décollage




limiting take-off climb requirement

critère minimal de montée au décollage [ exigence limitative de montée après décollage ]




carry out necessary procedures prior to take off | undertake required actions before departure | conduct pre-flight activities | execute necessary procedures prior to take off

exécuter les procédures nécessaires avant décollage
IN-CONTEXT TRANSLATIONS
8". landing and take-off cycle" means the cycle that includes taxi in and out, take-off, climb out, approach, landing and all other aircraft activities that take place below the altitude of 3000 feet.

8. «cycle d'atterrissage et de décollage», le cycle comprenant la phase de roulage au sol (au départ et à l’arrivée), le décollage, la montée, l’approche, l’atterrissage et toutes les autres opérations de l’aéronef ayant lieu à une altitude inférieure à 3 000 pieds;»


(a) aircraft performance during take-off, climb, cruise, holding, descent, landing and diversion;

a) les performances de l’aéronef au décollage, en montée, en croisière, en attente, en descente, à l’atterrissage et pendant les déroutements;


8". landing and take-off cycle" means the cycle that includes taxi in and out, take-off, climb out, approach, landing and all other aircraft activities that take place below the altitude of 3000 feet;

8. «cycle d'atterrissage et de décollage», le cycle comprenant la phase de roulage au sol (au départ et à l’arrivée), le décollage, la montée, l’approche, l’atterrissage et toutes les autres opérations de l’aéronef ayant lieu à une altitude inférieure à 3 000 pieds;»


51.2.4. Optional: Power at the power take-off (PTO) at the rated speed(s) (in accordance with OECD Code 2 (57) or ISO 789-1:1990 (Agricultural tractors — Test procedures — Part 1: Power tests for power take-off))

51.2.4. Facultatif: Puissance à la prise de force (PDF), au(x) régime(s) normalisé(s) [selon le code 2 de l'OCDE (57) ou la norme ISO 789-1:1990 (Tracteurs agricoles — Méthodes d'essai — Partie 1: Essais de puissance à la prise de force)]


(iii) with smooth transition from take-off to the best rate-of-climb speed using normal piloting skills; and

(iii) de façon à pouvoir effectuer une transition harmonieuse du décollage à la vitesse ascensionnelle optimale avec des habiletés de pilotage normales;


(3) For the purposes of section 602.126, a person may conduct a take-off in an aircraft in IMC where weather conditions are below the take-off minima specified in the instrument approach procedure, if the person

(3) Pour l’application de l’article 602.126, une personne peut effectuer le décollage d’un aéronef en IMC lorsque les conditions météorologiques sont inférieures aux minimums de décollage précisés dans les procédures d’approche aux instruments si les conditions suivantes sont réunies :


(g) simulated engine failure procedures during a take-off and a missed approach;

g) la procédure de panne moteur simulée pendant le décollage et l’approche interrompue;


A specified route designed for channelling the flow of traffic as necessary for the provision of air traffic services, from the end of the take-off and initial climb phase to the commencement of the approach and landing phase.

Route déterminée destinée à canaliser la circulation pour permettre, le cas échéant, d'assurer les services de la circulation aérienne, de la fin de la phase de décollage et de montée initiale au début de la phase d'approche et d'atterrissage.


In 1999, in order to increase the altitude at which Boeing 747 fly over residential areas, the operators of those aircraft were advised to review their operational procedures to ensure a minimum rate of climb at take off.

En 1999, les exploitants de Boeing 747 ont été avisés de réviser leurs procédures opérationnelles pour assurer un taux de montée minimal au décollage, de manière à augmenter l’altitude de ces avions au-dessus des zones résidentielles.


(b) Take-off climb procedures for noise abatement specified by an operator for any one aeroplane type should be the same for all aerodromes.

(b) Les procédures de montée antibruit après décollage spécifiées par l'exploitant pour un même type d'avion doivent être les mêmes sur tous les aérodromes.


1. This Regulation lays down the requirements on procedures for flight plans in the pre-flight phase in order to ensure the consistency of flight plans, repetitive flight plans and associated update messages between operators, pilots and air traffic services units through the Integrated Initial Flight Plan Processing System, either in the period preceding the first delivery of air traffic control clearance for flights taking off from within the airspace covered by this Regulation or in the period preceding entry into that airspace for other flights.

1. Le présent règlement définit les règles en matière de procédures applicables aux plans de vol durant la phase préalable au vol afin de garantir la cohérence des plans de vol, des plans de vol répétitifs et des messages d'actualisation associés entre les exploitants, les pilotes et les unités du service de la circulation aérienne par le truchement du Système intégré de traitement initial des plans de vol, pendant la période qui précède la première délivrance de l’autorisation du contrôle de la circulation aérienne pour les vols dont le point de départ se situe à l’intérieur de l’espace aérien couvert par le présent règlement ou pendant ...[+++]


Take-off climb limits – Mass, Altitude, Temperature;

les limitations de montée au décollage - masse, altitude, température;


(c) Inability to achieve predicted performance during take-off or initial climb.

c) Impossibilité d'atteindre les performances prévues lors du décollage ou de la montée initiale.


The gradient of the take-off flight path from the height reached in accordance with sub-paragraph (4) above to the end of the take-off flight path is equal to the one engine inoperative en-route climb gradient shown in the Aeroplane Flight Manual.

la pente de la trajectoire de décollage en partant de la hauteur atteinte conformément aux dispositions du sous-paragraphe (4) ci-dessus jusqu'à la fin de la trajectoire de décollage est égale à la pente de montée en route un moteur en panne spécifiée dans le manuel de vol.


(b) For instrument approaches with decision heights below 200 ft, an operator must verify that the approach mass of the aeroplane, taking into account the take-off mass and the fuel expected to be consumed in flight, allows a missed approach gradient of climb, with the critical engine failed and with the speed and configuration used for go-around of at least 2·5%, or the published gradient, whichever is the greater.

(b) Dans le cadre d'approches aux instruments avec des hauteurs de décision inférieures à 200 ft, l'exploitant doit vérifier que la masse de l'avion lors de la procédure d'approche - compte tenu de la masse au décollage et de la consommation de carburant prévue en cours de vol - permet, en cas d'approche interrompue, une pente de montée au minimum égale à 2,5% avec la vitesse et la configuration utilisées pour la remise des gaz, et le moteur critique en panne, ou égale à la pente publiée, la plus élevée des deux.


General – Take-off and Landing Climb

Généralités - Montée après décollage et en remise des gaz


(g)‘landing and take-off cycle’ means a cycle represented by the following time in each operating mode: approach 4,0 minutes; taxi/ground idle 26,0 minutes, take-off 0,7 minutes; climb 2,2 minutes.

«cycle d'atterrissage et de décollage» : un cycle représenté par le temps suivant pour chaque mode opératoire: approche 4,0 minutes; phase de circulation et de ralenti au sol 26,0 minutes, décollage 0,7 minute; montée 2,2 minutes.


(g) "landing and take-off cycle" means a cycle represented by the following time in each operating mode: approach 4,0 minutes; taxi/ground idle 26,0 minutes, take-off 0,7 minutes; climb 2,2 minutes.

g) "cycle d'atterrissage et de décollage": un cycle représenté par le temps suivant pour chaque mode opératoire: approche 4,0 minutes; phase de circulation et de ralenti au sol 26,0 minutes, décollage 0,7 minute; montée 2,2 minutes.


(g) "landing and take-off cycle" means a cycle represented by the following time in each operating mode: approach 4,0 minutes; taxi/ground idle 26,0 minutes, take-off 0,7 minutes; climb 2,2 minutes;

g) "cycle d'atterrissage et de décollage": un cycle représenté par le temps suivant pour chaque mode opératoire: approche 4,0 minutes; phase de circulation et de ralenti au sol 26,0 minutes, décollage 0,7 minute; montée 2,2 minutes;


- Gross failure to achieve predicted performance during take-off or initial climb.

- Une forte détérioration par rapport aux performances prévues lors du décollage ou de la montée initiale.